Current On Going Projects List

NAME OF THE
CLIENT
LOCATIONDESCRIPTION OF THE WORKPROJECT
COST (IN
CRORES)
NHPC

PRINCIPAL
CONTRACTOR:
RITHWIK-HIPL
JOINT VENTURE
JORETHANG, SIKKIM
CONSTRUCTION OF BALANCE CIVIL
WORKS PACKAGE LOT -I FOR DIVERSION
CHANNEL, COFFER DAMS, DAM, SPILLWAY &
STILLING BASIN, INTAKE STRUCTURE,
DESILTING CHAMBERS, SFT, HRT,
SURGE SHAFT, PRESSURE SHAFT,
SURFACE POWER HOUSE, TRC AND
OTHER ASSOCIATED STRUCTURES ETC.
OF RANGIT-IV HE PROJECT, SIKKIM.
675.00
DEPARTMENT OF
IRRIGATION,
GOVERNMENT
OF TELANGANA


PRINCIPAL
CONTRACTOR:-
BVSR - SKR - HEC
JV (BRR
PROJECTS AND
SKR
CONSTRUCTIONS)
SATHUPALLY, TELANAGANASITA RAMA LIFT IRRIGATION PROJECT
PACAKAGE No.12 – SATHUPALLY TRUNK
EARTHWORK EXCAVATION, FORMING
EMBANKMENT AND CONSTRUCTIONS
OF CM & CD WORKS, CC LINING FOR
FORMATION

PALAVAGU BRANK CANAL FROM
Km.1.925 NEAR GANDUGULAPALLY
(V) TO Km.13.500 NEAR ARLAPENTA
(V)


GOLLAGUDEM DISTRIBUTORY FROM
Km.13.500 NEAR ARLAPENTA (V) TO
Km.31.875 AT MALKARAM (V) OF
DAMMAPETA (M)

VINAYAKAPURAM DISTRIBUTORY
FROM Km.0/0 NEAR ARLAPENTA (V)
OF DAMMAPETA (M) TO Km.23.850
NEAR VINAYAKAPURAM (V) OF
ASWARAOPETA (M) IN BHADRADRI
KHAMMAM DISTRICT IN TELANGANA
298.74
DEPT. OF
IRRIGATION,
GOVERNMENT OF
TELANGANA


PRINCIPAL
CONTRACTOR:-
L&T
PARNASHALA,
TELANGANA
CONSTRUCTION OF RETAINING WALL
AT PARNASHALA FOR “SITAMMA SAGAR
MULTI PURPOSE PROJECT”
65.41
DEPT. OF
IRRIGATION,
GOVERNMENT OF
TELANGANA


PRINCIPAL
CONTRACTOR:-
KNR
CONSTRUCTIONS
LTD
TELANGANAPROVIDING AND LAYING IN SITU
VIBRATED M-20 GRADE CEMENT
CONCRETE USING 40MM DOWN SIZE
APPROVED, CLEAN, HARD, GRADED
AGGREGATES FOR SUB-STRUCTURE/
SUPER STRUCTURE WORKS
INCLUDING COST OF MATERIALS,
MACHINERY, LABOUR, FORMWORK,
SCAFFOLDING, CLEANING, BATCHING,
MIXING, PLACING IN POISTION,
LEVELLING, VIBRATING, FINISING,
CURING ETC., COMPLETE WITH INITIAL
LEAD UPTO 50M AND ALL LIFTS
63.84
NHAI

PRINCIPAL
CONTRACTOR:-
GRINFRA
PRJOECTS LTD
MADANAPALLE,
ANDHRA
PRADESH
CONSTRUCTION OF FOUR LANES FOR
NH-71 FROM MADANAPALLI TO PILERU
PACKAGE -1 ON HAM MODE IN STATE
OF AP UNDER BHARATMALA
PARIYOJANA
53.04
APMDC
PRINCIPAL
CONTRACTOR:-
TRIVENI EARTH
MOVERS PVT LTD
MANGAMPETA,
ANDHRA
PRADESH
DEPLOYMENT OF HEMM FOR LOADING
AND HAULING OF OVERBURDEN FROM
MINES TO WASTE TO DUMP WITHIN A
LEAD OF 5KM
50.00
VIJAYAWADA
MUNICIPAL
CORPORATION
VIJAYAWADA,
ANDHRA PRADESH
CONSTRUCTION OF RETAINING WALLS,
APPROCAHES ON BOTH SIDES OF RUB
(RAILWAY UNDER BRIDGE) AND
ELECRIFICATION WORKS FOR RUB AT
MADHURA NAGAR UNDER EPC SYSTEM
15.00
DEPT OF
IRRIGATION,
GOVERNMENT OF
AP

PRINCIPAL
CONTRACTOR:-
RITHWIK
PROJECTS PVT
LTD
NANDYAL,
ANDHRA PRADESH
WATER RESOURCES DEPARTMENT –
IMPREOVEMENTS TO ESCAPE
CHANNEL, NIPPULAVAGU, GALERU
RIVER AND KUNDU RIVER FROM
Km0.000 TO Km189.200 AND
REGRADATION OF VAGU, FLOOD
PROTECTION WORKS, PROVIDING
HIGH LEVEL BRIDGES AT ENROUTE
VILLAGES FOR IMPROVING THE
CARRYING CAPACITY TO 35000
CUSECS
207.00
NHPC LTD.DIKCHU,SIKKIMPACKAGE -4, CIVIL WORKS FOR CLEANING, REPAIR AND RESTORATION WORK OF HRT (ADIT-1 TO ADIT-3) OF TEESTA-V POWER STATION, SIKKIM10.65
TOTAL WORK IN HAND 1428.95