NAME OF THE CLIENT | LOCATION | DESCRIPTION OF THE WORK | PROJECT COST (IN CRORES) |
---|---|---|---|
NHPC PRINCIPAL CONTRACTOR: RITHWIK-HIPL JOINT VENTURE | JORETHANG, SIKKIM | CONSTRUCTION OF BALANCE CIVIL WORKS PACKAGE LOT -I FOR DIVERSION CHANNEL, COFFER DAMS, DAM, SPILLWAY & STILLING BASIN, INTAKE STRUCTURE, DESILTING CHAMBERS, SFT, HRT, SURGE SHAFT, PRESSURE SHAFT, SURFACE POWER HOUSE, TRC AND OTHER ASSOCIATED STRUCTURES ETC. OF RANGIT-IV HE PROJECT, SIKKIM. | 675.00 |
DEPARTMENT OF IRRIGATION, GOVERNMENT OF TELANGANA PRINCIPAL CONTRACTOR:- BVSR - SKR - HEC JV (BRR PROJECTS AND SKR CONSTRUCTIONS) | SATHUPALLY, TELANAGANA | SITA RAMA LIFT IRRIGATION PROJECT PACAKAGE No.12 – SATHUPALLY TRUNK EARTHWORK EXCAVATION, FORMING EMBANKMENT AND CONSTRUCTIONS OF CM & CD WORKS, CC LINING FOR FORMATION PALAVAGU BRANK CANAL FROM Km.1.925 NEAR GANDUGULAPALLY (V) TO Km.13.500 NEAR ARLAPENTA (V) GOLLAGUDEM DISTRIBUTORY FROM Km.13.500 NEAR ARLAPENTA (V) TO Km.31.875 AT MALKARAM (V) OF DAMMAPETA (M) VINAYAKAPURAM DISTRIBUTORY FROM Km.0/0 NEAR ARLAPENTA (V) OF DAMMAPETA (M) TO Km.23.850 NEAR VINAYAKAPURAM (V) OF ASWARAOPETA (M) IN BHADRADRI KHAMMAM DISTRICT IN TELANGANA | 298.74 |
DEPT. OF IRRIGATION, GOVERNMENT OF TELANGANA PRINCIPAL CONTRACTOR:- L&T | PARNASHALA, TELANGANA | CONSTRUCTION OF RETAINING WALL AT PARNASHALA FOR “SITAMMA SAGAR MULTI PURPOSE PROJECT” | 65.41 |
DEPT. OF IRRIGATION, GOVERNMENT OF TELANGANA PRINCIPAL CONTRACTOR:- KNR CONSTRUCTIONS LTD | TELANGANA | PROVIDING AND LAYING IN SITU VIBRATED M-20 GRADE CEMENT CONCRETE USING 40MM DOWN SIZE APPROVED, CLEAN, HARD, GRADED AGGREGATES FOR SUB-STRUCTURE/ SUPER STRUCTURE WORKS INCLUDING COST OF MATERIALS, MACHINERY, LABOUR, FORMWORK, SCAFFOLDING, CLEANING, BATCHING, MIXING, PLACING IN POISTION, LEVELLING, VIBRATING, FINISING, CURING ETC., COMPLETE WITH INITIAL LEAD UPTO 50M AND ALL LIFTS | 63.84 |
NHAI PRINCIPAL CONTRACTOR:- GRINFRA PRJOECTS LTD | MADANAPALLE, ANDHRA PRADESH | CONSTRUCTION OF FOUR LANES FOR NH-71 FROM MADANAPALLI TO PILERU PACKAGE -1 ON HAM MODE IN STATE OF AP UNDER BHARATMALA PARIYOJANA | 53.04 |
APMDC PRINCIPAL CONTRACTOR:- TRIVENI EARTH MOVERS PVT LTD | MANGAMPETA, ANDHRA PRADESH | DEPLOYMENT OF HEMM FOR LOADING AND HAULING OF OVERBURDEN FROM MINES TO WASTE TO DUMP WITHIN A LEAD OF 5KM | 50.00 |
VIJAYAWADA MUNICIPAL CORPORATION | VIJAYAWADA, ANDHRA PRADESH | CONSTRUCTION OF RETAINING WALLS, APPROCAHES ON BOTH SIDES OF RUB (RAILWAY UNDER BRIDGE) AND ELECRIFICATION WORKS FOR RUB AT MADHURA NAGAR UNDER EPC SYSTEM | 15.00 |
DEPT OF IRRIGATION, GOVERNMENT OF AP PRINCIPAL CONTRACTOR:- RITHWIK PROJECTS PVT LTD | NANDYAL, ANDHRA PRADESH | WATER RESOURCES DEPARTMENT – IMPREOVEMENTS TO ESCAPE CHANNEL, NIPPULAVAGU, GALERU RIVER AND KUNDU RIVER FROM Km0.000 TO Km189.200 AND REGRADATION OF VAGU, FLOOD PROTECTION WORKS, PROVIDING HIGH LEVEL BRIDGES AT ENROUTE VILLAGES FOR IMPROVING THE CARRYING CAPACITY TO 35000 CUSECS | 207.00 |
NHPC LTD. | DIKCHU,SIKKIM | PACKAGE -4, CIVIL WORKS FOR CLEANING, REPAIR AND RESTORATION WORK OF HRT (ADIT-1 TO ADIT-3) OF TEESTA-V POWER STATION, SIKKIM | 10.65 |
TOTAL WORK IN HAND | 1428.95 |